Division 12. FUTURE CONSTRUCTION CHARGE RIDER; SCHEDULE FCC-1 |
§ 24-311. Generally.
(a)
Effective date: Bills rendered on or after February 19, 2013.
(b)
Applicability: Applicable to all electric tariffs of the City of Cartersville Electric System (CES) wherein the future construction charge rider is referenced.
(c)
Purpose: To recover from retail electric customers the cost of financing associated with the construction of generation and/or transmission facilities.
(d)
Monthly rate: The base electric rate tariffs shall be increased by a percentage amount. The base electric rate is the sum of the administration charge, demand charge, and energy charge.
(e)
Evaluation: The future construction cost will be reviewed annually and the future construction charge (FCC) shall be reviewed and modified as necessary by the electric director.
(Ord. No. 51-12, § 1, 11-1-12)