§ 7.5-225. Post-development stormwater management performance criteria.  


Latest version.
  • The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article:

    (1)

    Water quality. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if:

    a.

    It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;

    b.

    Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; and

    c.

    Runoff from hotspot land uses and activities identified by the City of Cartersville are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices.

    (2)

    Stream channel protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three (3) approaches:

    a.

    Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer;

    b.

    Twenty-four-hour extended detention storage of the one-year, twenty-four-hour return frequency storm event;

    (This requirement may be adjusted or waived by the City of Cartersville for sites that discharge directly into larger streams, rivers, wetlands, or lakes, or to a manmade channel or conveyance system where the reduction in these flows will not have an impact on upstream or downstream stream bank or channel integrity.)

    c.

    Erosion prevention measures such as energy dissipation and velocity control.

    (3)

    Overbank flooding protection. Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the twenty-five-year, twenty-four-hour return frequency storm event. If control of the one-year, twenty-four-hour storm under section 7.5-225(2)b. is exempted, then peak discharge rate attenuation of the two-year through the twenty-five-year return frequency storm event must be provided. (This requirement may be adjusted or waived by the City of Cartersville for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.)

    (4)

    Extreme flooding protection. Extreme flood and public safety protection shall be provided by controlling and safely conveying the one hundred-year, twenty-four-hour return frequency storm event such that flooding is not exacerbated. (This requirement may be adjusted or waived by the City of Cartersville for sites where the post-development downstream analysis shows that uncontrolled post-development conditions will not increase downstream peak flows, or that meeting the requirement will cause greater peak flow downstream impacts than the uncontrolled post-development conditions.)

    (5)

    Structural stormwater controls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from City of Cartersville before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the City of Cartersville may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question.

    Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control.

    (6)

    Stormwater credits for nonstructural measures. The use of one (1) or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under section 7.5-225(1). The applicant may, if approved by the City of Cartersville, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual.

    (7)

    Drainage system guidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public rights-of-way. Stormwater conveyance facilities that are designed to carry runoff from more that one (1) parcel, existing or proposed, shall meet the following requirements:

    a.

    Methods to calculate stormwater flows shall be in accordance with the stormwater design manual;

    b.

    All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and

    c.

    Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual.

    (8)

    Dam design guidelines. Any land disturbing activity that involves a site which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable.

(Ord. No. 61-06, 8-17-06)